how much time should be spent on software design as a percent of the entire construction phase?
Question : how much time should be spent on software design as a percent of the entire construction phase?
We are estimating the design phase and overall construction phase of an IT software (j2EE) project. Is there any industry “standard” as to how much time should be spent designing , compared with total construction. I have seen figures ranging from 10-30 % . Would like to hear from some experts. Thank you!
construction estimating software
Best answer:
Answer by alsmithjpsnet
Depends on the nature of the project, but I think a good general rule of thumb is 50/50. Since they are developing from design specifications, the beter the specifications the beter the results.
10-50 percent